Ship lift structure at the Slapy dam

Basic data

Id No. 4185
Locality description Czech Republic, Slapy dam
Short description The study deals with the design of the driven structures of the ship lift at the Slapy Dam, which is some 35 km upstream from Prague on the River Vltava. The dam profile is the main reason why the water route from Prague to České Budějovice is not navigable for ships of tonnage up to 300 tons. At present studies deal with several variants of the ship lift structure. Despite the fact that none of the variants has been chosen for further stages of the project preparation, the text describes in detail only two of the planned variants – the lock with high lift and the sloping ship lift.
Start of documentation process 01.03.2006
End of documentation process 01.06.2006
investment costs 1750 mil. Kč
Projector Metroprojekt Praha, a.s. - Ing. Martin Jakoubek
Projector Subcontractors expertní studie byla zpracována ve sdružení s: Hydroprojekt CZ, a.s. Pöyry Environment a.s.
Investor Středočeský kraj, Zborovská 11, 150 21 Praha 5

Map

Project gallery






 

Total images in gallery: 5

SEARCH

SELECTED ReferencE

The tram line was in a state of serious wear and tear. Extent of modifications: from Balabenka Crossroads including branching (1 x 6 crossings) – connected to the point crossing from Palmovka and to the reconstructed point crossings from direction Českomoravská. The end of the reconstructed section was behind the crossing with Na Břehu Street where a short section was constructed from large panels and connected to existing situation behind the Na Břehu Street. The tram line reconstruction included platform lighting, draining of the line body, repair of insulation on the Rokytka brook bridging and road marking. An automated irrigation of the grass-cover of the tram line body was implemented for the first time in Prague. The repair of the large-area tram line panels between Na Břehu Street and OSN was performed by DP under the same traffic lockout. The reconstruction of roads and adjacent pavements of Sokolovská Street in the section Balabenka-Na Břehu for the investor TSK Praha was performed under the same traffic lockout. More...