The Turecký Vrch Railway Tunnel

Basic data

Id No. 4052
Locality description Trenčianske Bohuslavice,Slovak republic
Short description The project of the modernisation of main railway corridors is in progress in Slovakia. The project includes the railway route Nové Mesto nad Váhom – Púchov. This route leads through a rugged country, which, in the Turecký Vrch section, is listed as a protected landscape area. Authors of the design studied several variants. The straightened alignment, and environmental reasons in particular eventually contributed to their preference to the tunnel variant over an up to 40 m deep side-hill cut leading along the entire length of the hill side. The mined double-rail tunnel is 1,775 m long, with the length of the mined section amounting to 1,740 m. The cut-and-cover sections total 35 m. The maximum overburden depth is 100 m. Complicated geological conditions, verified by an exploration gallery, were the reason why the authors of the design selected the New Austrian Tunnelling Method, which allows a flexible response to changes expected in geological conditions. The lining of the mined tunnel consists of two shells with an intermediate waterproofing membrane covering the vault and side walls. The tunnel profile is designed with regard to train aerodynamics, for the speed of 160 km/h (prospectively 200 km/h).
Start of documentation process 01.11.2005
End of documentation process 30.03.2006
Start of realization 07.06.2007
End of realization 07.06.2007
investment costs 1670 mil. Kč
Projector METROPROJEKT Praha a.s. I.P.Pavlova 2/1786, 120 00 Praha 2
Investor Železnice Slovenskej republiky, Bratislava Klemensova 8 813 61 Bratislava

Project gallery


1-Primary lining 400mm thick, 2-Temporary lining 300mm thick, 3-ø 108/16 tube micropiles or self-drilling micropiles injected with cement grout, 4-FACE SUPPORT: GRP anchors injected with cement grout, 5-Side drifts: GRP forepoles, 6-Side drifts: GRP


Total images in gallery: 3

SEARCH

SELECTED ReferencE

The documentation for the decision on zoning approval includes a proposed extension of the existing tram line Hlubočepy-Sídliště Barrandov that was opened in November 2003. The proposed extension connects to the existing stop Sídliště Barrandov and continues in the south-western direction on the axis of the planned street area. It will have a length of approximately 1.5 km and include a total of 3 stops with provisory names Kaskády, Holyně and Slivenec. The extension is ended with a new tramway loop Slivenec between Holyně and Slivenec on the cadastral area of Slivenec, north of K Barrandovu Street next to an agricultural premises. The new track runs mostly outside the existing built-up area over development areas behind the current end of the Barrandov housing estate. Similar to the existing line, the extended tram line will be the backbone of the mass transportation system in this area. In the first phase (after putting into operation), it will serve to inhabitants in the existing living area at the end of the Barrandov housing estate (Kaskády housing estate), in Holyně and in Slivence. In the following phase (after the completion of hte development areas) also for the new housing estate. The follow-up bus transportation will provide transportation services on a wider surrounding area. The main benefit of the tram line construction is enhance quality of transportation services on the territory. The tram line construction includes only such buildings and operating units that are necessary for the tram line operation, usually provided by DP a. s. as investor. Further, it includes all indispensable related shifts and bypasses of roads and underground utility lines.. The extent of the construction is evident from the list of constructional and operational units and their functional description. Electricity for the tramway line is planned to be supplied from the Barrandov converter station. However, the construction does not include the final road along the tramway body and in the future built-up area, the main water pipes and underground utility services for the future housing estate and the built-up area. It is expected that in the course of further preparation, investors and designers of the roads and engineering services will be appointed and preparatory work will start. After that, the tram line construction can be mutually coordinated including solution of the situation during putting into operation of the track and roads. More...