APN D2, D3 and related operational areas

Charakteristika

Preparation of project documentation for the construction of reinforced airport areas that will comply with to the overall spatial and functional design of areas designated for aircraft landing and takeoff – D2, D3 areas, connecting TWY systems including their interconnections, handling areas, and service roads.

Documentation for building construction covers the construction of new airport movement areas and the reconstruction of existing ones, along with related equipment. The construction is linked to the existing movement areas in the space between Pier C of Terminal T2, Terminal T2 and RWY 12/30, and in the space between the future Pier D of Terminal T2 and the future pRWY 06R/24L. The main purpose of the construction is to increase the capacity for aircraft handling and de-icing. Another purpose of the construction is to increase the capacity of the TWYs taxiway system, which also means an increase in the safety of ground operations for A/C and MMP. Simultaneously with this Prague Airport project, part of the advance support structure for the railway tunnel for the line from the future Prague - Václav Havel Airport station in the direction of Kladno (the so-called loop) will also be constructed as part of the new Prague - Airport - Kladno railway connection. The construction is also coordinated with the planned construction of the parallel runway pRWY 06L/24R.