Charakteristika

Preparation of project documentation for the construction of reinforced airport areas that will comply with to the overall spatial and functional design of areas designated for aircraft landing and takeoff – D2, D3 areas, connecting TWY systems including their interconnections, handling areas, and service roads.

Documentation for building construction covers the construction of new airport movement areas and the reconstruction of existing ones, along with related equipment. The construction is linked to the existing movement areas in the space between Pier C of Terminal T2, Terminal T2 and RWY 12/30, and in the space between the future Pier D of Terminal T2 and the future pRWY 06R/24L. The main purpose of the construction is to increase the capacity for aircraft handling and de-icing. Another purpose of the construction is to increase the capacity of the TWYs taxiway system, which also means an increase in the safety of ground operations for A/C and MMP. Simultaneously with this Prague Airport project, part of the advance support structure for the railway tunnel for the line from the future Prague - Václav Havel Airport station in the direction of Kladno (the so-called loop) will also be constructed as part of the new Prague - Airport - Kladno railway connection. The construction is also coordinated with the planned construction of the parallel runway pRWY 06L/24R.

Client/Investor

Prague airport

Author/Processors

"MP + AGA APN D2" company, chief engineer: Ing. Petr Čiviš ml. and Ing. arch. Hana Vermachová

Construction realization and contractor

Not yet selected

Completed

Documentation for building construction was completed by 2025, the final draft will be used for the selection of the contractor, estimated implementation - in the years 2026 - 2029

Subject of the work

Documentation for building construction